UWB Tags for Indoor Location Tracking
In a real-time location system, (RTLS) tags are small electronic devices that are attached to objects that need to be tracked. The tags send out blinks that are received by anchors and forwarded to the location server for calculating the tags’ position. RTLS Tags are used for work in progress tracking, asset tracking, vehicle tracking, material flow analysis and employee location tracking for safety reasons.
As each vertical and use case bring in different tag requirements, Sewio developed three different tags to allow customers to choose the right tag to meet both their needs and budget. The design of the system also enables Sewio partners to further customize the tags.
For midsize organizations to enterprises that are struggling to increase their efficiency, Sewio RTLS tags provide a real-time tracking and identification solution. Unlike traditional indoor tracking technologies, only Sewio provides high accuracy together with a long tag battery life, enabling the tracking of thousands of tags within one area.

Key Features of UWB Tags
Instant Location Status
Position changes communicated instantly, delivering a real-time location status


Industry Proven Accuracy
Only Sewio’s accuracy of up to 30 cm (1 feet) is proven by real enterprise industrial projects
Long Battery Life
Battery lifetime in years, attributed to TDoA position calculation and motion detection. Please see the battery lifetime calculator.

Various Power Supply Options
Sewio UWB tags comes with various power supply options including wireless charging for easy maintenance
Ready-Made Housings
Various ready-made housings available, including industrial grade housings


Open for Customization
Open design for easy customization (full source code and blueprints available to selected partners)
Built-in Sensors
The multi-functional board contains a UWB chip and sensors such as accelerometer and barometer.

Effortless Configuration
Smooth firmware updates by BLE and quick reconfiguration and commissioning via NFC
Sewio UWB Tag Types

Leonardo Personal: People/employee tracking and identification
Leonardo Asset: Object tracking and identification – coin battery powered
Leonardo Vehicle: Object tracking and identification with an external power supply
Sewio UWB Tags Feature Matrix
Features and Sensors Explained
Motion Detection: Turns the tag on as soon it detects motion, thereby increasing the battery life when the tag is at rest
BLE: Bluetooth (BLE) is used for easy updates to the tag’s firmware
NFC: Near Field Communication (NFC) is used for tag reconfiguration and commissioning/pairing the tag with the tracked object
ACC: Accelerometer (ACC) switches the tag on from sleeping mode
BAR: A barometer delivers precise atmospheric pressure measurement that is used for detecting the height position of the tag (Z axis)
OEM: Every Sewio RTLS tag can be purchased as an OEM (Original Equipment Manufacturer) version for fitting into a custom housing
UWB Tag Pricing and Delivery
A complete pricelist, including lead times, is available upon request. Sewio Partners can download the latest version of pricelist within Sewio Partner Portal. Read more about how to become a Sewio partner.
Useful Tag Utilities
Sewio’s unique RTLS tags have a battery lifetime of 3-5 years. The calculator allows you to predict the battery lifetime based on the required refresh rate, RF profile and radio channel used.
While the overall number of tags within RTLS is unlimited, the tag channel utilization calculator tells you how many active tags can be within a single location cell at one moment.
Customizations and Extensions of Tags
Sewio UWB tags are ready-made for advanced extensions and HW/FW customization. The open design is easily customizable as the full source code and blueprints are available to Sewio partners.
The open design allows you to:
- Connect your own tag design in Sewio RTLS TDoA
- Send a custom payload from a tag
- Add a sensor to a tag
- Connect a tag to another embedded system
- Change the behavior of a tag
The following sources are available:
- Application notes covering custom tag integration and all UWB messages transferred over the air
- Dimensions/blueprints
- Pinout and HW descriptions
- Tag schematics
- Firmware source code
- Firmware documentation
Sewio UWB RTLS Tags
Tag Leonardo Personal
Both tags are battery powered with wireless charging, well suited for people/employee location tracking and identification. The tags find most usage in industry, and the retail, entertainment, sports, museums and healthcare industries. Use cases include personnel safety, security, attendance, navigation, movement analytics, process verification, location-based interactions and marketing.
Decawave UWB Radio providing true location via an API
Bluetooth Low Energy (BLE) for firmware updates
Near Field Communication (NFC) for reconfiguration and commissioning
Wireless Charge
Configurable via a web browser and RTLS Studio
A battery life of years
Accelerometer
A barometer providing atmospheric pressure data for detecting height (Z-axis)

Please see the full documentation for Tag Leonardo Personal.
Tag Leonardo Asset
Tag Leonardo Asset is coin battery powered and tailored for any asset tracking and identification needs. It is the right-first-time choice for eKanban, asset tracking and material flow analysis use cases. It brings highly positive ROI for customers in industry, intralogistics, warehousing and retail. The tag features NFC for commissioning and configuration and BLE for firmware uploads. The tags can be extended by magnets for easy attachment to/detachment from tracked objects.
Decawave UWB Radio providing true location via an API
Bluetooth Low Energy (BLE) for firmware updates
Near Field Communication (NFC) for reconfiguration and commissioning
Configurable via a web browser and RTLS Studio
A battery life of years
Powered by a 1000 mAh CR2477 battery

Please see the full documentation for Tag Leonardo Asset.
Tag Leonardo Vehicle
Tag Leonardo Vehicle is ready-made for the tracking and identification of objects that can power it. The tag does not contain a battery, which simplifies its maintenance. This tag is a perfect fit for tracking forklifts, AGVs and milk runs within the industry, intralogistics and warehousing verticals.
Decawave UWB Radio providing true location via an API
Bluetooth Low Energy (BLE) for firmware updates
Near Field Communication (NFC) for reconfiguration and commissioning
Configurable via a web browser and RTLS Studio
Accelerometer
A barometer providing atmospheric pressure data for detecting height (Z-axis)
An external power supply DC 7 – 35 V

Please see the full documentation for Tag Leonardo Vehicle.
For older versions of tags, please see legacy UWB tags.